Prepare a schedule, add cost and staffing resources, and review status.
Every table edits and saves in place β click any field to change it. Use the + Add buttons to add rows and the π icon at the end of a row to delete it.
Task & TimelineSchedule Input
Resources & CostCost Input
Deliverables
Risk & Forecast
Gantt Chart
Status Dashboard
Schedule β Phases, Tasks & Logic Ties
In progressAt riskLateCompletePhase (rolled up)Critical pathDeliverable
Phase / Task
Status Dashboard
Visual snapshot of current progress β updates automatically as you edit Tasks, Deliverables, and % Complete.
Default view is lean β Task, Start, End, Duration, Resource, % Complete, Status. Check Show all columns above for Timeline, Budget, Predecessors, Successors, Float and Notes. Task/ID columns stay pinned on the left while you scroll horizontally.
This is the schedule input tab. The WBS you build here β phases, tasks, dates, resources, and logic links β drives everything else: the Gantt chart, critical path, cost roll-ups, cash flow, status dashboard, and the downloadable reports. Start by adding phases and tasks before filling in the other tabs.
Set dates two ways: edit Start and End directly, or edit Start and Dur (d) β Duration is now an input; changing it recalculates the End date (Start + Duration). Editing End directly still works too and Duration updates to match. Duration is now in working days β it skips weekends (per the Working Calendar setting) and any dates listed in Holidays, both on the Resources & Cost tab. Weekends/holidays are excluded from the day count and from Start+DurationβFinish, and the critical path engine uses the same working-day durations, so float and criticality reflect actual working time, not raw calendar spans.
Use the pick lists in Predecessors / Successors to link tasks β choose the linked task, logic type (FS/SS/FF/SF) and lag/lead in calendar days, then click +. Adding a link from either end keeps both sides in sync. Float is a manually-entered cell (defaults to 0) β the muted number next to it is the tool's own CPM-calculated float (in working days) for reference. Critical-path tasks (per the CPM engine) are flagged "CP" automatically. The Timeline column shows a live mini Gantt bar that updates as you edit dates and % complete.
Budget is resource-loaded automatically: labor = each staffing row's Daily Rate Γ Allocation % Γ days its Start/End overlaps this task, plus materials/services whose Linked Task points here. Hover a Budget cell for the full breakdown. This weights the cost forecast's Earned Value by each task's actual resource load instead of a flat average β a task with heavy staffing/materials now counts more toward % complete claimed than a light one.
ID
Task
Start
End
Dur (d)
Timeline
Resource(s)
Budget
Predecessors
Successors
Float (d)
Notes
% Cmp
Status
Delete
Deliverables List
ID
Deliverable
Linked Task
Due Date
Owner
Status
Rev
Notes
Delete
This is the cost input tab. Staffing rates, materials/equipment costs, and budget lines you enter here drive the resource-loaded Task Budgets on Task & Timeline, the Earned Value/CPI/EAC forecast, and the Status Dashboard's S-curve. Start with Staffing and Materials before entering Cost Structure and Change Orders below.
Staffing Plan
Load Type: Full-Time locks Allocation at 100%; Part-Time (FTE) lets you set the FTE fraction as an Allocation % (e.g. 50% = 0.5 FTE) for this resource's StartβEnd duration. Effort Hours = working days in range (per the Working Calendar setting above) Γ Hours/Day Γ Allocation %. Daily Rate Γ Allocation % Γ overlapping working days also feeds each task's resource-loaded Budget (with hours) on the Task & Timeline tab β a resource is counted on any task whose dates overlap this row's Start/End. Daily Rate defaults to 650 (in your project currency) if left blank. Currency, Working Calendar, and Hours/Day are set once at the top of the page and apply project-wide β Hours/Day is fully user-defined (not fixed at 8); set it to whatever your actual working day is, e.g. 8, 9, or 10 hours, including half-hour increments.
Name
Role / Discipline
Load Type
Allocation %
Daily Rate
Start
End
Effort Hours
Assigned Tasks
Notes
Delete
Holidays
Specific dates listed here are excluded as working days β on top of the Working Calendar's day-of-week pattern β when calculating Staffing Effort Hours, Task Budget labor cost, and resource-loaded Earned Value. This does not shift task dates, durations, or the critical path; the Gantt/CPM engine still treats every calendar day as available.
Date
Holiday Name
Delete
Materials & Site Resources
Costs entered here roll up into the KPIs above. Click Sync to Cost Structure to push the total into a dedicated budget line in the Project Cost Structure section below. Effort Hours is pulled live from the Staffing Plan section above (each resource's duration Γ Standard Hrs/Day Γ Allocation %) β edit rates, allocation, and load type there.
Materials & Equipment β Procurement or Rental
ID
Item
Type
Procurement
Vendor
Qty
Unit
Unit Cost
Total
Linked Task
Expected
Actual
Status
Delete
Consumables List
ID
Item
Category
Unit
Qty Required
Qty On Hand
Unit Cost
Total
Supplier
Delete
Tools List
ID
Tool / Equipment
Ownership
Assigned To
Condition
Inspection/Cal. Due
Rental Cost
Notes
Delete
Material Inventory
ID
Material
Location
Qty On Hand
Unit
Min Level
Unit Cost
Value
Status
Last Updated
Delete
Repair & Recovery
ID
Item / Equipment
Issue
Date Reported
Action
Cost
Status
Completion Date
Delete
Waste Management
ID
Waste Type
Hazardous
Qty
Unit
Disposal Method
Disposal Date
Cost
Delete
Temporary Facilities
ID
Facility
Vendor
Setup Date
Teardown Date
Cost
Status
Delete
Third-Party Services
Covers outside services such as inspection & testing and regulatory consultation β link each to a WBS task for timing and it rolls into the cost totals above.
ID
Service
Category
Vendor / Provider
Scope
Cost
Scheduled Date
Linked Task
Status
Delete
Project Cost Structure
Staffing Plan Cost and Materials & Resources Cost below are pulled live from those sections above (Daily Rate Γ Allocation % Γ duration for staffing; procurement/consumables/tools/repair/waste/temp facilities/services for materials) β they're informational until you click Sync, which writes them as dedicated budget lines below so they count toward Original/Revised Budget and Variance.
ID
Category / Phase
Budgeted
Committed
Actual
Variance
Notes
Delete
Change Order Log β approved orders add to the revised budget above
ID
Title
Date
Description
Cost Impact
Sched. Impact (d)
Status
Approved By
Delete
Change Log
Link each change to an existing WBS phase/task, or mark it New WBS (to be assigned) and use + Add to WBS to schedule it directly into the Tasks list. After scheduling changes, consider rebaselining from the Risk & Forecast tab so schedule slip tracking reflects the updated plan.
ID
Date
Category
Description
Raised By
Impact
WBS Reference
Status
Delete
Payment Milestones
ID
Milestone
Linked Deliverable
Amount
Due Date
Status
Invoice Date
Paid Date
Delete
Invoice & Payment Tracker
ID
Type
Party
Description
Amount
Invoice Date
Due Date
Status
Paid Amount
Delete
Project Cash Flow
Planned (cumulative, from payment milestones)Actual (cumulative, from paid invoices)Materials & Resources (cumulative, from procurement/repair/waste/temp facility dates)
Risk Log
Probability-weighted exposure uses standard weights β Low 15%, Medium 40%, High 70% β applied to each open risk's potential cost/schedule impact. Rating combines probability with impact size relative to the revised budget.
A baseline is a frozen snapshot of the current schedule, budget, payment milestones, and materials/resources totals β captured on a date you choose. Every capture is logged as a new revision (Rev 1, Rev 2β¦) so you always know what was baselined, when, and what changed since.
Baseline Revision Log
Rev
Date
Status
CP Duration
Baseline Budget
Payment Milestones
Materials & Resources Total
Notes
Revised Schedule Forecast β vs. current baseline revision